News

Roadworks

03/09/2019

Traffic interruptions

Daws Heath Road, Rayleigh, Essex

05 September — 06 September

Delays likely Diversion route

Name: Diversion

Location: Daws Heath Road

Description: Streetworks / License - Streetworks

Responsibility for event: Essex

Current status: Planned


Daws Heath Road, Rayleigh, Essex

05 September — 06 September

Delays likely Road closure

Name: Daws Heath Road

Location: Daws Heath Road

Description: Streetworks / License - Streetworks

Responsibility for event: Essex

Current status: Planned


Daws Heath Road, Rayleigh, Essex

05 September — 06 September

Delays likely Diversion route

Name: Diversion 1

Location: Daws Heath Road

Description: Streetworks / License - Streetworks

Responsibility for event: Essex

Current status: Planned


Weir Pond Road, Rochford, Essex

09 September — 10 September

Delays likely Road closure

Name: Weir Pond Road

Location: Weir Pond Road

Description: Streetworks / License - Streetworks

Responsibility for event: Essex

Current status: Planned


Weir Pond Road, Rochford, Essex

09 September — 10 September

Delays likely Diversion route

Name: Diversion

Location: Weir Pond Road

Description: Streetworks / License - Streetworks

Responsibility for event: Essex

Current status: Planned


Barling Road, Barling Magna, Essex

06 September — 17 October

Delays possible Temporary speed limit

Name: Barling Road

Location: Barling Road

Description: Streetworks / License - Streetworks

Responsibility for event: Essex

Current status: Planned


Roadworks

A1015 Eastwood Road, Rayleigh, Essex

10 September — 10 September

Delays likely Traffic control (multi-way signals)

Works location: OPP BROCKETTS POST OFFICE

Works description: Erect 6mt combi post complete & transfer service

Responsibility for works: Essex

Current status: Planned work about to start

Works reference: EP10000008358


A1159 Eastern Avenue, Southend-on-sea, Southend-on-sea

09 September — 13 September

Delays likely Lane closure

Works location: FROM THE ROUNDABOUT WITH SUTTON ROAD WEST FOR APPROX...

Works description: These works are for theinstallation of a fibre network, Works are to complete a road crossing ahead...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG019SS-CCN-0015


A127,A1158 Prince Avenue, Westcliff-on-sea, Southend-on-sea

03 September — 05 September

Delays likely Lane closure

Works location: Near Tesco Roundabout outside the store...

Works description: Replace knocked down sign post, opp Column 10 A/B Use straight post, 3.5m above ground locate 0.6m...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR100G-MAIN-00037144


A127,A1158 Prince Avenue, Westcliff-on-sea, Southend-on-sea

09 September — 20 September

Delays likely Lane closure

Works location: Prince Avenue x10 Various Columns...

Works description: A127 Street Lighting Project Replacing x10 Columns...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/LIGHTING/PG


A127,A1158 Prince Avenue, Westcliff-on-sea, Southend-on-sea

09 September — 20 September

Delays likely Lane closure

Works location: Prince Avenue x6 Various Columns...

Works description: A127 Street Lighting Project Replacing x6 Columns...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/LIGHTING/PG/A


A127 Arterial Road, Leigh-on-sea, Southend-on-sea

09 September — 20 September

Delays likely Lane closure

Works location: Arterial Road x5 Various Columns...

Works description: A127 Street Lighting Project Replacing x5 Columns...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/LIGHTING/PG/D


A127 Arterial Road, Leigh-on-sea, Southend-on-sea

09 September — 20 September

Delays likely Lane closure

Works location: Arterial Road x14 Various Columns...

Works description: A127 Street Lighting Project Replacing x14 Columns...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/LIGHTING/PG/B


A127 Arterial Road, Leigh-on-sea, Southend-on-sea

09 September — 20 September

Delays likely Lane closure

Works location: Arterial Road x10 Various Columns...

Works description: A127 Street Lighting Project Replacing x10 Columnsstarting at Column 36a/b near progress road to col...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/LIGHTING/PG/C


A127 Arterial Road, Rayleigh, Essex

09 September — 13 September

Delays likely Lane closure

Works location: A127 Southend arterial road

Works description: Replace 2 damaged cabinets and calibrate cameras. Night works - 21:00 - 05:00hrs

Responsibility for works: Essex

Current status: Planned work about to start

Works reference: EP02231003656


A13,B1016 Ness Road, Shoeburyness, Southend-on-sea, Southend-on-sea

03 September — 05 September

Delays likely Traffic control (multi-way signals)

Works location: FROM S/O 96 TO O/S 98 NESS ROAD SHOEBURYNESS SS3 9DJ...

Works description: SHOEBURYNESS 666574 - To lay 14m Duct-F/W 2 Ways and 14m Duct-C/W 2 Ways. Works in conjnction with S...

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WGFASTWAKVT75Z01


A13 London Road, Hadleigh, Benfleet, Essex

04 September — 04 September

Delays likely Traffic control (two-way signals)

Works location: outside 659

Works description: INSTALL A 10M TSG COLUMN WITH A 0.5M OUTREACH BRACKET ARM, TRANSFER EXISTING LANTERN, TELECELL, ALL INTERNAL WIRING AND NUMBER TRANSFER DNO SERVICE REMOVE COLUMN

Responsibility for works: Essex

Current status: Planned work about to start

Works reference: EP10000008393


A13 London Road, Leigh-on-sea, Southend-on-sea

09 September — 16 September

Delays likely Traffic control (two-way signals)

Works location: Lansdowne Avenue to Woodfield Park Drive....

Works description: South side footway resurfacing....

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR001LANS-WOODFWRESURF


Ashingdon Road, Hawkwell, Essex

08 September — 08 September

Delays likely Traffic control (multi-way signals)

Works location: o.s 495 ASHINGDON ROAD, ss4 3et

Works description: ROCHFORD 671826 - BLOCKAGES – Excavate onto BT ducts for the clearance of duct blockages in FW to facilitate spine cabling works.

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WBAUSEWALNP45M02


B1013 Aldermans Hill, Hockley, Essex

11 September — 11 September

Delays likely Traffic control (two-way signals)

Works location: OUtside 14

Works description: Tree cutting 10:00am - 15:00pm

Responsibility for works: Essex

Current status: Planned work about to start

Works reference: EP02231003584


B1013 Main Road, Hawkwell, Essex

09 September — 13 September

Delays likely Traffic control (two-way signals)

Works location: Zebra crossing on Main Road, outside house number 222

Works description: Upgrade existing zebra street lighting, new tactile layout, new footway surface course.

Responsibility for works: Essex

Current status: Planned work about to start

Works reference: EP201EH2269971


B1015 East Street, Southend-on-sea, Southend-on-sea

04 September — 17 September

Delays likely Traffic control (two-way signals)

Works location: From 28A to S/O 106 East Street and C/Way cross overs side of 70 and O/S 30 East Street...

Works description: Lay 230 metres of duct in the footway and 15 metres in carriageway from 28a to side of 106 East Stre...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025/SEFTTH/PN019D


B1015 Sutton Road, Southend-on-sea, Southend-on-sea

07 September — 14 October

Delays likely Traffic control (two-way signals)

Works location: From Stock Road to s/o The Forum on Sutton Road...

Works description: Excavation for the installation of fibre optic cabling, chambers and tobies. Approx excavation: 100m...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG019SS-CCN-0013


B1017 High Street, Great Wakering, Essex

08 September — 08 September

Delays likely Traffic control (two-way signals)

Works location: Opp 283

Works description: REPLACE X3 FRAMES & COVERS IN CARRIAGEWAY AND REINSTATE

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Planned work about to start

Works reference: EN0143328882


Blenheim Chase, Leigh-on-sea, Southend-on-sea

04 September — 05 September

Delays likely Traffic control (multi-way signals)

Works location: At junction with Kenilworth and at lights...

Works description: Break out & renew valve frame & cover and reinstate carriageway...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143310937


Bull Lane, Rayleigh, Essex

04 September — 06 September

Delays likely Traffic control (multi-way signals)

Works location: From outside of 157 Bull Lane to outside of 177 Bull Lane on Bull Lane

Works description: RAYLEIGH V5028 - PON 602445 - Remedial works to clear HA Defect

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006MU1WSEP00IBWU21TS02


Chichester Road, Southend-on-sea, Southend-on-sea

09 September — 13 December

Delays likely Road closure

Works location: Jtn Tylers Avenue

Works description: Installation of new drainage system, kerbing, footway and renewal of carriageway surfacing....

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/CSTRIPS/03/01


Elm Road, Leigh-on-sea, Southend-on-sea

04 September — 17 September

Delays likely Traffic control (two-way signals)

Works location: 76.

Works description: Construction of PVX.

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR00118/00112PVXWHR


Gore Road, Ballards Gore, Essex

03 September — 05 September

Delays likely Traffic control (multi-way signals)

Works location: At the junction of STAMBRIDGE ROAD on GORE ROAD

Works description: CANEWDON V5002 - PON 520848 - TRAFFIC MANAGEMENT to facilitate BT Openreach Fibre Cabling Works – Portable traffic signal head only, linked to notice/permit number BC005MU1WSEP00IBUD1RKY18,20,21

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005MU1WSEP00IBUD1RKY19


Stambridge Road, Stambridge, Essex

03 September — 05 September

Delays likely Traffic control (multi-way signals)

Works location: Approx 45m South West from junc with GORE ROAD on STAMBRIDGE ROAD

Works description: CANEWDON V5002 - PON 520848 - Cable jointing and splicing to complete BT Spine works

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005MU1WSEP00IBUD1RKY18


Stornoway Road, Southend-on-sea, Southend-on-sea

06 September — 26 September

Delays likely Road closure

Works location: J/O HAMSTEL ROAD

Works description: IMGA150334. ONE HOLE TO BE OPENED ON JUNCTION, NO MAINS REPLACEMENT TOTAKE PLACE. THIS IS A CONNECTI...

Responsibility for works: Cadent

Current status: Advanced planning

Works reference: AZ0071000833558


Sutton Road, Rochford, Essex

08 September — 08 September

Delays likely Traffic control (Stop/Go boards)

Works location: O/S 25 EAST TO OPP 58 ON SUTTON ROAD, ROCHFORD, SS4 1HJ

Works description: ROCHFORD V5104 - PON 568493 - Overlay – Lay approx 182FWm of Duct 54/56 in to link existing BT Boxes to facilitate spine cabling works.

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005MU1WSEP00IBUUV1JP11


Trinity Road, Southend-on-sea, Southend-on-sea

06 September — 26 September

Delays likely Road closure

Works location: J/O HAMSTEL ROAD

Works description: IMGA150334. ONE HOLE TO BE OPENED ON JUNCTION, NO MAINS REPLACEMENT TOTAKE PLACE. THIS IS A CONNECTI...

Responsibility for works: Cadent

Current status: Advanced planning

Works reference: AZ0071000833582


Tylers Avenue, Southend-on-sea, Southend-on-sea

09 September — 13 December

Delays likely Road closure

Works location: Jtn Chichester Road

Works description: Installation of new drainage system, kerbing, footway and renewal of carriageway surfacing....

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/CSTRIPS/03/02


Apton Hall Road, Stambridge, Essex

03 September — 05 September

Delays possible Traffic control (multi-way signals)

Works location: Approx 78m West from opp the junction of STAMBRIDGE ROAD to heading further approx 641m West on APTON HALL ROAD

Works description: CANEWDON V5002 - PON 520848 - Cable jointing and splicing to complete BT Spine works

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005MU1WSEP00IBUD1RKY20


Ashingdon Road, Rochford, Essex

06 September — 10 September

Delays possible Some carriageway incursion

Works location: O/S 174 AND 176

Works description: STOPTAP RENEW IN FOOTWAY AND REINSTATE

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Planned work about to start

Works reference: EN0143335419


Avondale Road, Rayleigh, Essex

04 September — 06 September

Delays possible Traffic control (multi-way signals)

Works location: NEAR THE JUNCTION WITH BULL LANE ON AVONDALE ROAD

Works description: RAYLEIGH - V5028 - PON 602445 - TRAFFIC MANAGEMENT - Portable traffic signal head only, linked to BC006MU1WSEP00IBWU21TS02 - with no Excavation.

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005MU1WSEP00IBWU21TS06


B1013 Main Road, Hockley, Essex

10 September — 16 September

Delays possible Some carriageway incursion

Works location: OS 222 and opp 222. f\w.

Works description: Connections Highway Services:Works on behalf of local authority (Works For Road Purposes) :discon/recon of two lamp columns

Responsibility for works: Essex

Current status: Planned work about to start

Works reference: EP10670011611


Barling Road, Great Wakering, Essex

06 September — 17 October

Delays possible Traffic control (two-way signals)

Works location: MULTIPLE EXCAVATIONS FROM 128 BARLING ROAD TO 100M SOUTH OF SHOPLANDROADNEAR NATIONAL SPEED LIMITSIGN

Works description: Mains Replacement

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000843917


Belgrave Road, Eastwood, Southend-on-sea

04 September — 17 September

Delays possible Traffic control (multi-way signals)

Works location: From side of 543 Rayleigh Road to 4 Belgrave Road. C/W crossovers side of 543 Rayleigh Road and 2 Be...

Works description: Lay 50 metres of duct in the footway and 14 metres in the carriageway from side of 543 Rayleigh Road...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025/SEFTTH/PN017O


Burdett Road, Southend-on-sea, Southend-on-sea

10 September — 12 September

Delays possible Traffic control (multi-way signals)

Works location: O/S 8 BURDETT ROAD, SOUTHEND ON SEA,...

Works description: MARINE 676774 - Overlay ... Lay approx 8m of Duct 54/56 in CW to link existing BT Boxes to facilit...

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WBAUSEWAMF192M01


Marcus Avenue, Thorpe Bay, Southend-on-sea

03 September — 04 September

Delays possible Traffic control (multi-way signals)

Works location: Junction Station Road...

Works description: TS Heads for AD037-RO56495745...

Responsibility for works: Anglian Water

Current status: Advanced planning

Works reference: AD037RO56495745/01


Pargat Drive, Eastwood, Southend-on-sea

03 September — 05 September

Delays possible Traffic control (multi-way signals)

Works location: JUNCTION OF RAYLEIGH ROAD...

Works description: SLG ONLY JUNCTION OF RAYLEIGH ROAD MANUALLY CONTROLLED LIGHTS AS REQUESTED...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025SEFTTH/PN017N


Princess Road, Rayleigh, Essex

04 September — 06 September

Delays possible Traffic control (multi-way signals)

Works location: NEAR THE JUNCTION WITH BULL LANE ON PRINCESS ROAD

Works description: RAYLEIGH - V5028 - PON 602445 - TRAFFIC MANAGEMENT - Portable traffic signal head only, linked to BC006MU1WSEP00IBWU21TS02 - with no Excavation.

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005MU1WSEP00IBWU21TS05


St Andrews Road, Shoeburyness, Southend-on-sea, Southend-on-sea

03 September — 05 September

Delays possible Traffic control (multi-way signals)

Works location: JCT NESS RTOAD ON ST ANDREWS ROAD SHOEBURYNESS SS3 9DJ...

Works description: SHOEBURYNESS 666574 - Traffic Management Only. Works in conjnction with Ness Road...

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WGFASTWAKVT75Z02


Station Road, Thorpe Bay, Southend-on-sea

03 September — 04 September

Delays possible Traffic control (multi-way signals)

Works location: just before jnc to Marcus ave in carriageway...

Works description: to break out and replace m/h cover and frame in c/way...

Responsibility for works: Anglian Water

Current status: Advanced planning

Works reference: AD037RO56495745


Waterford Road, Shoeburyness, Southend-on-sea, Southend-on-sea

06 September — 23 October

Delays possible Traffic control (multi-way signals)

Works location: O/S NO 10 TO O/S NO 50 & OPP NO 18 TO J/O CHURCH ROAD...

Works description: IMGA203167. MAJOR MAINS REPLACEMENT WORK - TO ABANDON 535MOFIRONMAINANDREPLACE IT WITH 535M OF PE MA...

Responsibility for works: Cadent

Current status: Advanced planning

Works reference: AZ0071000834976


A127 Arterial Road, Leigh-on-sea, Southend-on-sea

04 September — 17 September

Delays unlikely No carriageway incursion

Works location: Side of 122 Bellhouse Road to 203 Arterial Road...

Works description: Lay 70m duct in the footway on Arterial road...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025KG025/SEFTTH/PN053B


A13 London Road, Leigh-on-sea, Southend-on-sea

04 September — 06 September

Delays unlikely No carriageway incursion

Works location: O/S 1855 - 1857

Works description: Replace stoptap, pipework to boundary (renew back to main if material is lead) and reinstate footway...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143331777


A13 London Road, Leigh-on-sea, Southend-on-sea

05 September — 06 September

Delays unlikely No carriageway incursion

Works location: SS9

Works description: SELF DEFECT- Rectify works in Footway...

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000844968


A13 London Road, Leigh-on-sea, Southend-on-sea

10 September — 12 September

Delays unlikely Some carriageway incursion

Works location: OPP 1176 LONDON ROAD, LEIGH-ON-SEA SS9 2UE...

Works description: LEIGH ON SEA 681185 - To build new FW joint box and lay approx m of Duct 54/56 in...

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WBAUSEWAMP1A4E01


A13 London Road, Westcliff-on-sea, Southend-on-sea

03 September — 05 September

Delays unlikely Some carriageway incursion

Works location: 383, LONDON ROAD, WESTCLIFF ON SEA, SS0 7HU...

Works description: Replace stoptap, check material of service, connect to customers supply and reinstate footway & carr...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143165351


A13 Queensway Slip Road Nw, Southend-on-sea, Southend-on-sea

03 September — 05 September

Delays unlikely Some carriageway incursion

Works location: Porters Roundabout, Slip Road onto Queensway, (London Bound)...

Works description: renew PGR

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR100G-MAIN-00037177


Admirals Walk, Shoeburyness, Southend-on-sea

03 September — 16 September

Delays unlikely Traffic control (give & take)

Works location: 148

Works description: PVX

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR001PVX19/00043MCD


Ambleside Drive, Southend-on-sea, Southend-on-sea

04 September — 06 September

Delays unlikely Some carriageway incursion

Works location: jnc Southchurch ave

Works description: renew green pedestrian barriers at jnc, x3 . bent into footway...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR100G-MAIN-00036749


Ambleside Drive, Southend-on-sea, Southend-on-sea

10 September — 23 September

Delays unlikely Traffic control (give & take)

Works location: 109.

Works description: Construction of PVX.

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR00119/00113PVXMH


Argyll Road, Westcliff-on-sea, Southend-on-sea

04 September — 17 September

Delays unlikely Some carriageway incursion

Works location: 20

Works description: PVX

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR001PVX19/00141MCD


Armitage Road, Southend-on-sea, Southend-on-sea

05 September — 09 September

Delays unlikely Traffic control (give & take)

Works location: 20

Works description: STOPTAP RENEW IN FOOTWAY AND REINSTATE...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143331220


Ashurst Avenue, Southend-on-sea, Southend-on-sea

10 September — 12 September

Delays unlikely Traffic control (give & take)

Works location: 38

Works description: METER INSTALL IN FOOTWAY AND REINSTATE...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143324590


Avenue Road, Leigh-on-sea, Southend-on-sea

06 September — 10 September

Delays unlikely Some carriageway incursion

Works location: tarmac

Works description: 1X TRANSFER TO STREET LIGHTING COLUMN, ALREADY INSTALLED...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/17471/JB


Avenue Road, Westcliff-on-sea, Southend-on-sea

11 September — 12 September

Delays unlikely No carriageway incursion

Works location: o\s 63/65 in the f\w

Works description: Section 81 - to reset surface box in footway...

Responsibility for works: Cadent

Current status: Advanced planning

Works reference: AZ007183105NL


Avenue Road, Westcliff-on-sea, Southend-on-sea

11 September — 12 September

Delays unlikely No carriageway incursion

Works location: o\s 15 in the f\w

Works description: Section 81 - to reset surface box in footway...

Responsibility for works: Cadent

Current status: Advanced planning

Works reference: AZ007183104NL


Avenue Road, Westcliff-on-sea, Southend-on-sea

11 September — 12 September

Delays unlikely No carriageway incursion

Works location: Outside 65 on footway...

Works description: Section 81 - reset surface box in footway...

Responsibility for works: Cadent

Current status: Advanced planning

Works reference: AZ007183441NL


Avenue Road, Westcliff-on-sea, Southend-on-sea

11 September — 12 September

Delays unlikely No carriageway incursion

Works location: Outside 61 on footway...

Works description: Section 81- to reset surface box in footway...

Responsibility for works: Cadent

Current status: Advanced planning

Works reference: AZ007183442NL


Avondale Road, Rayleigh, Essex

11 September — 12 September

Delays unlikely Traffic control (give & take)

Works location: Whole Length

Works description: 2019/20 Minor Capital Footway Scheme: Slurry Seal.

Responsibility for works: Essex

Current status: Planned work about to start

Works reference: EP201EH2280378


B1013 Cherry Orchard Way, Rochford, Essex

04 September — 06 September

Delays unlikely No carriageway incursion

Works location: Approx. 45m south from roundabout with Cherry Orchard Way

Works description: Carrying out trial hole works in the grass verge. No works in the carriageway with 1.5m of footway to be maintained.

Responsibility for works: T-Mobile (UK) Limited

Current status: Planned work about to start

Works reference: YN123SOS026/GRES/KR


B1015 Sutton Road, Southend-on-sea, Southend-on-sea

06 September — 10 September

Delays unlikely No carriageway incursion

Works location: SUTTON ROAD OPP 388

Works description: 1X RECONNECTION TO STREET LIGHTING WORKS ALREADY INSTALLED...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/17473/JB1


B1015 West Road, Westcliff-on-sea, Southend-on-sea

06 September — 10 September

Delays unlikely Some carriageway incursion

Works location: tarmac

Works description: 1XRECONNECTION TO STREET LIGHTING COLUMN ALREADY INSTALLED...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/17472/JB


B1016 Eastern Esplanade, Southend-on-sea, Southend-on-sea

03 September — 05 September

Delays unlikely Some carriageway incursion

Works location: o/s 6 EASTERN ESPLANADE, southend on sea, ss1 2er...

Works description: MARINE 673348 - Overlay ... Lay approx 3m of Duct 54/56 in fw to link existing BT Boxes to facilit...

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WBAUSEWALTFL0M02


B1016 Eastern Esplanade, Southend-on-sea, Southend-on-sea

10 September — 12 September

Delays unlikely Some carriageway incursion

Works location: EXCAVATING IN FOOTWAY OUTSIDE 22 EASTERN ESPLANADE...

Works description: GS(IU)R CUT OFF -GAS SERVICE DISCONNECTION WITH EXCAVATION UNDER OURMANDATORY OBLIGATION TO COMPLYWI...

Responsibility for works: Cadent

Current status: Advanced planning

Works reference: AZ0071000867178


B1016 High Street, Southend-on-sea, Southend-on-sea

09 September — 07 October

Delays unlikely No carriageway incursion

Works location: P Tomassi & Son Ltd, 7-9, High Street....

Works description: Scaffolding - to facilitate urgent guttering repairs. Bays scaffolding Limited....

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR001SCAFFPERM2623


Banyard Way, Rochford, Essex

06 September — 10 September

Delays unlikely Some carriageway incursion

Works location: OS 26 AND OS 32 BANYARD WAY, ROCHFORD

Works description: ROCHFORD - 536358 - CLEAR TWO BLOCKAGES IN DUCT

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005MU1WSEP00IBUA8MEK01


Barrymore Walk, Rayleigh, Essex

09 September — 11 September

Delays unlikely No carriageway incursion

Works location: 8

Works description: Replace stoptap with meter chamber and reinstate footpath

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Planned work about to start

Works reference: EN0143320714


Bellhouse Road, Eastwood, Southend-on-sea

05 September — 06 September

Delays unlikely Some carriageway incursion

Works location: OS 77 ON BELLHOUSE RD LEIGH-ON-SEA...

Works description: EASTWOOD 377048 - REMEDIAL WORKS - to clear Internal Defect fw...

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WBAUSEIBPV0DDR07


Beresford Road, Southend-on-sea, Southend-on-sea

06 September — 09 September

Delays unlikely No carriageway incursion

Works location: O/S 40 A BERESFORD ROAD SOUTHEND-ON-SEA SS1 2TW...

Works description: INSTALL TEE IN FOOTWAY ...

Responsibility for works: VIRGIN MEDIA

Current status: Advanced planning

Works reference: NK100/SSSMRE/100303408


Blatches Chase, Eastwood, Southend-on-sea

04 September — 06 September

Delays unlikely Some carriageway incursion

Works location: 24

Works description: Replace wash out and reinstate footway...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143326830


Bramble Road, Hadleigh, Benfleet, Essex

11 September — 17 September

Delays unlikely No carriageway incursion

Works location: Outside 170 Bramble Road, Benfleet, Essex. verge.

Works description: Connections Small Service:Moving overhead electrical cables underground: :Disconnection and removal of existing single phase overhead supply. New single phase connection made at top of pole in verge and taken underground to new meter position.

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Planned work about to start

Works reference: EC30034825580


Brightwell Avenue, Westcliff-on-sea, Southend-on-sea

11 September — 13 September

Delays unlikely Some carriageway incursion

Works location: 51

Works description: Interim to Perm reinstate footway...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Planned work about to start

Works reference: EN0143312133


Broadway, Leigh-on-sea, Southend-on-sea

06 September — 10 September

Delays unlikely No carriageway incursion

Works location: BROADWAY O/S 9

Works description: 1X DISCON/RECON TO STREET LIGHTING COLUMN...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/17945/JB


Brunel Road, Eastwood, Southend-on-sea

04 September — 06 November

Delays unlikely No carriageway incursion

Works location: Outside Units 2 and 4 Brunel Road....

Works description: Hoarding - Lars Communications. Length of hoarding 25 meters, Width of hoarding 20 meters, Clear foo...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR001HOARDPERM2648


Burnham Road, Leigh-on-sea, Southend-on-sea

04 September — 06 September

Delays unlikely Traffic control (give & take)

Works location: Side of 29 MARINE PARADE...

Works description: Repair/renew service, reinstate carriageway & footway...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143333380


Burr Hill Chase, Southend-on-sea, Southend-on-sea

06 September — 10 September

Delays unlikely Some carriageway incursion

Works location: BURR HILL CHASE O/S 14-24 HARDWICK COURT, O/S STEPHEN MCADDEN HOUSE CAR PARK...

Works description: 2X DISCONNECTIONS TO ILLUMINATED SIGNS...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/17862-17863/JB


Canterbury Avenue, Southend-on-sea, Southend-on-sea

09 September — 20 September

Delays unlikely Traffic control (give & take)

Works location: 6.

Works description: Construction of PVX.

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR00119/00157PVXMH


Canterbury Avenue, Southend-on-sea, Southend-on-sea

09 September — 20 September

Delays unlikely Traffic control (give & take)

Works location: 6.

Works description: Construction of PVX.

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR00119/00157/PVXMH


Chase End, Rayleigh, Essex

11 September — 17 September

Delays unlikely No carriageway incursion

Works location: OUTSIDE OF NO 9 CHASE END

Works description: ALTER AND RELAY EXISTING GAS SERVICE 2M FROM MAIN IN THE FOOTPATH

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000862958


Cheddar Avenue, Westcliff-on-sea, Southend-on-sea

05 September — 18 September

Delays unlikely Traffic control (give & take)

Works location: 32

Works description: PVX

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR001PVX19/00182MCD


Church Road, Rayleigh, Essex

05 September — 05 September

Delays unlikely Some carriageway incursion

Works location: OUTSIDE 21 TO 27 Church Road

Works description: POLE REMOVAL IN FOOTWAY

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005KL1W0000050174DNO/2


Cliffsea Grove, Leigh-on-sea, Southend-on-sea

03 September — 11 September

Delays unlikely Some carriageway incursion

Works location: 26

Works description: Renew lead service, connect to customers supply, reinstate carriageway & footway - Permit duration t...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143328593


Conway Avenue, Great Wakering, Essex

03 September — 05 September

Delays unlikely Some carriageway incursion

Works location: 111, CONWAY AVENUE, GREAT WAKERING, SS3 0BH

Works description: METER INSTALL IN FOOTPATH AND REINSTATE

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Planned work about to start

Works reference: EN0143331830


Cranleigh Drive, Leigh-on-sea, Southend-on-sea

05 September — 09 September

Delays unlikely Some carriageway incursion

Works location: s/o 1070

Works description: 1 x 25mm metered connection in footway & carriageway...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143319164B


Cromwell Road, Southend-on-sea, Southend-on-sea

09 September — 24 September

Delays unlikely Traffic control (give & take)

Works location: The whole of Cromwell Road...

Works description: These works are for the excavation for the installation of fibreoptic cable 300m FW x1 Road crossing...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG027SE-FTTH-PN039-08


Crowstone Avenue, Westcliff-on-sea, Southend-on-sea

04 September — 06 September

Delays unlikely Traffic control (give & take)

Works location: Os 27

Works description: carrigeway patch

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR100G-MAIN-00037234


Dane Street, Shoeburyness, Southend-on-sea, Southend-on-sea

09 September — 20 September

Delays unlikely Some carriageway incursion

Works location: jnc of George Street to s/o Beach Court...

Works description: 1 x 63mm metered connection with 6x 25mm for plot 1-6 in footway (collaboration with ref EN014 32927...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143292721


Dane Street, Shoeburyness, Southend-on-sea, Southend-on-sea

11 September — 16 September

Delays unlikely No carriageway incursion

Works location: Near Junction with George Street. f\w....

Works description: Connections Projects:Disconnection / reconnection of existing electricity supply for a customer:Exca...

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Advanced planning

Works reference: EC30034825857


Eastwood Park Drive, Eastwood, Southend-on-sea

03 September — 05 September

Delays unlikely Traffic control (priority working)

Works location: C/W crossovers outside 57 and side of 46 Eastwood Park Drive...

Works description: Lay 14 metres in the carriageway outside 57 and side of 46 Eastwood Park Drive...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025SEFTTH/PN030L


Elizabeth Close, Hawkwell, Essex

09 September — 10 September

Delays unlikely Traffic control (give & take)

Works location: Whole length of footway on both sides

Works description: 2019/20 Minor Capital Footway Scheme: Slurry Seal.

Responsibility for works: Essex

Current status: Planned work about to start

Works reference: EP201EH2280366


Fairfield Crescent, Eastwood, Southend-on-sea

03 September — 16 September

Delays unlikely Some carriageway incursion

Works location: From s/o 30 to 39 Fairfield Crescent footway both sides...

Works description: Lay 240m duct in footway on Fairfield crescent with chambers and cabinets as required. Cabinet locat...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025SEFTTH/PN030C


Fairfield Gardens, Eastwood, Southend-on-sea

05 September — 06 September

Delays unlikely Some carriageway incursion

Works location: 67 FARFIELD GARDENS, EASTWOOD...

Works description: EASTWOOD 676196 - Renew / Raise / Lower Frame and Cover on FW in...

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WBAUSEWAME9K5L01


Fairfield Gardens, Eastwood, Southend-on-sea

05 September — 25 September

Delays unlikely Traffic control (priority working)

Works location: Both sides of footway in Fairfield Gardens...

Works description: Lay 630m of track in the footway and 5m in carriageway...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025SEFFTH/PN030J


Fairlawn Gardens, Southend-on-sea, Southend-on-sea

11 September — 24 September

Delays unlikely Traffic control (give & take)

Works location: 26.

Works description: Construction of PVX.

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR00119/00103/PVXMH


Ferndale Road, Southend-on-sea, Southend-on-sea

09 September — 27 September

Delays unlikely Traffic control (give & take)

Works location: o/s 15

Works description: trial hole to investigate materials and condition in footway& carraigeway...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN013172270


Gainsborough Drive, Westcliff-on-sea, Southend-on-sea

10 September — 20 September

Delays unlikely Some carriageway incursion

Works location: From side of 104 Fairfax Drive to O/S 32...

Works description: Lay 280m of track in footway...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025SEFTTH/PN038C


George Street, Shoeburyness, Southend-on-sea, Southend-on-sea

09 September — 13 September

Delays unlikely Some carriageway incursion

Works location: jnc of Dane Street & approx 15m east of jnc of Dane Street...

Works description: 1 x connection of 63mm main for works in Dane Street in footway & 1 x disconnection in footway & car...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143292721A


Greenlands, Rochford, Essex

11 September — 17 September

Delays unlikely No carriageway incursion

Works location: IN FOOTPATH INFRONT OF 4 GREENLANDS, ROCHFORD, SS4 1ST. f\w.

Works description: Connections Small Works:Electrical service upgrade of customer supply to ensure safe and reliable power supply:EXCAVATION OF JOINT HOLE FOR CUT OUT CHANGE

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Planned work about to start

Works reference: EC30034825079


Hawkwell Chase, Hawkwell, Essex

03 September — 05 September

Delays unlikely Traffic control (give & take)

Works location: 34

Works description: Locate service, install stoptap and reinstate footway

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Planned work about to start

Works reference: EN0143338354


High Street, Leigh-on-sea, Southend-on-sea

05 September — 06 September

Delays unlikely Traffic control (give & take)

Works location: o/s Le Old Smack public house...

Works description: Man hole entry to line & repair combined sewer pipe...

Responsibility for works: Anglian Water

Current status: Advanced planning

Works reference: AD037RO55882241/1


Hillcrest Road, Southend-on-sea, Southend-on-sea

06 September — 10 September

Delays unlikely Some carriageway incursion

Works location: HILLCREST ROAD O/S 1

Works description: 1X DISCONNECTION TO STREET LIGHTNIG COLUMN...

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR003/17960/JB


Kensington Road, Southend-on-sea, Southend-on-sea

10 September — 23 September

Delays unlikely Traffic control (give & take)

Works location: 124.

Works description: Construction of PVX.

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR00118/00311/PVXMH


Kingsway, Westcliff-on-sea, Southend-on-sea

10 September — 11 September

Delays unlikely Some carriageway incursion

Works location: OPP 23 KINGSWAY , WESTCLIFF-ON-SEA...

Works description: LEIGH ON SEA 677922 - Renew / Raise / Lower Frame and Cover on FW in...

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WBAUSEWAMHUJ4P01


Leighfields Road, Eastwood, Southend-on-sea

09 September — 20 September

Delays unlikely Traffic control (priority working)

Works location: outside number 16 Leighfields Road...

Works description: Interim to permanent reinstarements in footway side of 24 and outside 23 Leighfields Road and carria...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Planned work about to start

Works reference: KG025SEFTTH/PN110P


Leigh Road, Leigh-on-sea, Southend-on-sea

04 September — 10 September

Delays unlikely No carriageway incursion

Works location: Outside 222 Leigh Road, Leigh on Sea, Essex . f\w....

Works description: Connections Small Service:Installation of a new electricity supply for a customer:Installation of a...

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Advanced planning

Works reference: EC30034824865


Leigh Road, Leigh-on-sea, Southend-on-sea

05 September — 11 September

Delays unlikely No carriageway incursion

Works location: o/s 258 Leigh Road SS9 1BW. f\w....

Works description: Connections Small Service:Disconnection / reconnection of existing electricity supply for a customer...

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Advanced planning

Works reference: EC30034825598


Leslie Gardens, Rayleigh, Essex

05 September — 09 September

Delays unlikely No carriageway incursion

Works location: SIDE OF NO 10. f\w.

Works description: Network Operations Faults:Emergency disconnection of electrical supply for safety reasons:Remedial works to rectify reinsatemet in the footway 1.5x1.2 6mm dbm

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Planned work about to start

Works reference: EC30034825790


Lime Avenue, Leigh-on-sea, Southend-on-sea

11 September — 24 September

Delays unlikely Traffic control (give & take)

Works location: 22.

Works description: Construction of PVX.

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR00118/00265PVXMH


Lingfield Drive, Rochford, Essex

05 September — 09 September

Delays unlikely Some carriageway incursion

Works location: JCT STAMBRIDGE ROAD ON LINGFIELD DRIVE ROCHFORD SS4 1EB

Works description: ROCHFORD 668488 - Permit to park vehicle only. In conjunction with works on Stambridge Road.

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006MU1WGFASTWALE5L7K02


Lord Roberts Avenue, Leigh-on-sea, Southend-on-sea

04 September — 06 September

Delays unlikely Traffic control (give & take)

Works location: 25

Works description: Interm to Perm reinstate of footway...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Planned work about to start

Works reference: EN0143317991


Lyndale Avenue, Southend-on-sea, Southend-on-sea

05 September — 09 September

Delays unlikely Traffic control (give & take)

Works location: 16

Works description: METER INSTALL IN FOOTWAY AND REINSTATE...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143341874


Mansell Close, Eastwood, Southend-on-sea

10 September — 23 September

Delays unlikely Some carriageway incursion

Works location: Side of 1 Hudson Road to 12-20 Mansell Close...

Works description: To lay 185 metres of duct in footway and cabinet already agreed with Ian Turnbull...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025/SEFTTH/PN053D


Nelson Road, Leigh-on-sea, Southend-on-sea

10 September — 11 September

Delays unlikely Some carriageway incursion

Works location: OS 52 NELSON ROAD,LEGH ON SEA, SS9 3HU...

Works description: LEIGH ON SEA 675147 - Renew / Raise / Lower Frame and Cover on FW in...

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WBAUSEWAMCF81S02


Nobles Green Road, Eastwood, Southend-on-sea

03 September — 05 September

Delays unlikely Traffic control (priority working)

Works location: C/W crossovers Outside 32 and Outside 37 Nobles Green Road...

Works description: To lay 14 metres in carriageway outside 32 and outside 37 Nobles Green Road...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025SEFTTH/PN030M


Oakhurst Road, Southend-on-sea, Southend-on-sea

09 September — 19 September

Delays unlikely Traffic control (give & take)

Works location: The whole of Oakhurst Road...

Works description: These works are for the excavation for the installation of fibreoptic cable 150m FW x2 Road Crossing...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG027SE-FTTH-PN098-05


Oakleigh Park Drive, Leigh-on-sea, Southend-on-sea

11 September — 13 September

Delays unlikely Traffic control (give & take)

Works location: O/S 142 AND 144,

Works description: PERM REINSTATE FOOTWAY...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Planned work about to start

Works reference: EN0143320593


Orchard Grove, Eastwood, Southend-on-sea

09 September — 11 September

Delays unlikely Traffic control (give & take)

Works location: outside 22

Works description: Replace fire hydrant frame and cover in slab footway and reinstate...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143333377


Park Road, Westcliff-on-sea, Southend-on-sea

03 September — 05 September

Delays unlikely Some carriageway incursion

Works location: J\w Queens Rd

Works description: carrigeway patch

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR100G-MAIN-00037182


Park Road, Westcliff-on-sea, Southend-on-sea

03 September — 05 September

Delays unlikely Traffic control (give & take)

Works location: J\w Avenue Rd

Works description: carrigeway patch

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR100G-MAIN-00037184


Plymtree, Thorpe Bay, Southend-on-sea

10 September — 12 September

Delays unlikely Traffic control (give & take)

Works location: 7

Works description: METER INSTALL IN FOOTWAY AND REINSTATE...

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Advanced planning

Works reference: EN0143333820


Poppyfield Close, Eastwood, Southend-on-sea

04 September — 17 September

Delays unlikely Traffic control (priority working)

Works location: side of 84 Bellhouse Road to 12 Poppyfield Close with road crossing side of 88 Belhouse Road...

Works description: Lay 140m duct in the footway. Cabinet location agreed with Ian Turnbull...

Responsibility for works: CITYFIBRE METRO NETWORKS LTD

Current status: Advanced planning

Works reference: KG025/SEFTTH/PN053C


Princes Street, Southend-on-sea, Southend-on-sea

11 September — 12 September

Delays unlikely No carriageway incursion

Works location: o\s 65 in the f\w

Works description: SECTION 81- To reset surface box in Footway...

Responsibility for works: Cadent

Current status: Advanced planning

Works reference: AZ007183782NL


Ramuz Drive, Westcliff-on-sea, Southend-on-sea

03 September — 05 September

Delays unlikely No carriageway incursion

Works location: O/S 144

Works description: footway patch

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR100G-MAIN-00037190


Rectory Grove, Leigh-on-sea, Southend-on-sea

04 September — 06 September

Delays unlikely Some carriageway incursion

Works location: 22 RECTORY GROVE LEIGH ON SEA SS9 2HE...

Works description: LEIGH ON SEA 673464 - To clear blockage...

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC006MU1WGFASTWALU096L01


Selbourne Road, Southend-on-sea, Southend-on-sea

04 September — 17 September

Delays unlikely Traffic control (give & take)

Works location: side of 1

Works description: PVX

Responsibility for works: Southend-on-Sea

Current status: Advanced planning

Works reference: JR001PVX18/00313MCD


Service Road For 71 to 93 Rochford Road, Southend-on-sea, Southend-on-sea

03 September — 05 September

Delays unlikely Traffic control (give & take)

Works location: Service Road For 71 To 93 Rochford Road...

Works description: Provide new straight pos